Phase 09: Trip Planner Modes TDD
- 3 plans created (09-01, 09-02, 09-03)
- 29 total tests planned across all scenarios
- TDD approach: Write tests first, fix code if tests fail

Plan 09-01: Scenario A Timezone & Conflict TDD (8 tests)
- Feature 1: Timezone boundary handling for date range (4 tests)
- Feature 2: Same-day multi-city conflict detection (4 tests)

Plan 09-02: Scenario B Filler Conflict TDD (9 tests)
- Feature 1: Filler game timing conflict prevention (4 tests)
- Feature 2: Impossible geographic combination detection (5 tests)

Plan 09-03: Scenario C Corridor Efficiency TDD (12 tests)
- Feature 1: Travel corridor game inclusion (5 tests)
- Feature 2: Geographic efficiency validation / anti-backtracking (7 tests)

Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2026-01-10 12:43:22 -06:00

7.7 KiB

phase, plan, type
phase plan type
09-trip-planner-modes-tdd 02 tdd
Test-driven validation of Scenario B (must-see games planning) filler game timing conflict prevention and impossible geographic combination detection.

Purpose: Ensure filler games don't conflict with anchored must-see games, and detect when selected games cannot be combined into a valid route. Tests define correctness - code must match. Output: Working filler conflict prevention and impossible combination detection with passing TDD tests.

<execution_context> ~/.claude/get-shit-done/workflows/execute-phase.md ./summary.md </execution_context>

@.planning/PROJECT.md @.planning/ROADMAP.md @.planning/STATE.md @.planning/phases/09-trip-planner-modes-tdd/09-01-SUMMARY.md @SportsTime/Planning/Engine/ScenarioBPlanner.swift @SportsTimeTests/ScenarioBPlannerTests.swift @SportsTimeTests/GameDAGRouterTests.swift

Tech stack available: Swift Testing framework, GameDAGRouter with anchor filtering, sliding window logic Established patterns: Swift Testing @Test/@Suite, TDD RED-GREEN-REFACTOR, anchor game validation Constraining decisions:

  • Phase 08-01: GameDAGRouter validates anchor games appear in all routes
  • Phase 08-02: Dynamic beam scaling prevents performance degradation
  • Phase 09-01: Timezone boundary handling and same-day conflict detection patterns

Issues being addressed: None (new test coverage)

Feature 1: Filler game timing conflict prevention SportsTimeTests/ScenarioBPlannerTests.swift SportsTime/Planning/Engine/ScenarioBPlanner.swift Test cases for filler games not conflicting with must-see games:

Case 1: Filler game between two must-see games (feasible timing)

  • Must-see: LA Jan 5 1pm, SF Jan 7 7pm
  • Filler available: San Jose Jan 6 7pm (between LA and SF, feasible)
  • Expected: Filler included in route (LA → SJ → SF)

Case 2: Filler game same-day as must-see (infeasible timing)

  • Must-see: LA Jan 5 7pm
  • Filler available: Anaheim Jan 5 7pm (same time, different city)
  • Expected: Filler excluded (cannot attend both at same time)

Case 3: Filler game requires backtracking

  • Must-see: LA Jan 5 7pm, SF Jan 7 7pm (north-bound route)
  • Filler available: San Diego Jan 6 7pm (south of LA, requires backtrack)
  • Expected: Filler excluded or route reordered if feasible

Case 4: Multiple filler options, only one feasible

  • Must-see: LA Jan 5 1pm, Phoenix Jan 7 7pm
  • Filler A: SF Jan 6 7pm (300mi north, wrong direction)
  • Filler B: Tucson Jan 6 7pm (100mi east toward Phoenix)
  • Expected: Route includes Filler B, excludes Filler A

Anchors are fixed - filler games must not create conflicts or geographic inefficiency. If tests fail:

  1. ScenarioBPlanner may not be filtering filler games by geographic feasibility
  2. GameDAGRouter may not be checking same-day timing conflicts for non-anchors
  3. Sliding window logic may include infeasible date ranges
  4. Fix ScenarioBPlanner's filler game selection logic

Do NOT weaken test assertions - fix the code to match expected behavior.

Feature 2: Impossible geographic combination detection SportsTimeTests/ScenarioBPlannerTests.swift SportsTime/Planning/Engine/ScenarioBPlanner.swift Test cases for detecting impossible must-see game combinations:

Case 1: Must-see games too far apart for date span

  • Must-see: LA Jan 5 7pm, New York Jan 6 7pm (2800 miles, 42hr drive)
  • Date range: Jan 5-6 (24 hours available)
  • Expected: .failure(.constraintsUnsatisfiable) - cannot drive 2800mi in 24hr

Case 2: Must-see games in reverse chronological order geographically

  • Must-see: SF Jan 5, LA Jan 4 (SF is after LA chronologically but north)
  • Expected: .failure(.dateRangeViolation) - SF game is before LA game but would require backtracking

Case 3: Three must-see games forming triangle (inefficient)

  • Must-see: LA Jan 5, SF Jan 6, San Diego Jan 7
  • Expected: Route attempts LA→SF→SD (but SD is south of LA) OR returns failure if too inefficient

Case 4: Must-see games exceed driving constraints

  • Must-see: LA Jan 5 1pm, Phoenix Jan 5 7pm (380 miles, 6hr drive)
  • Constraints: 1 driver, 4hr/day max
  • Expected: .failure(.drivingExceedsLimit) - 6hr drive exceeds 4hr limit

Case 5: Feasible must-see combination (sanity check)

  • Must-see: LA Jan 5 7pm, Anaheim Jan 7 7pm (30 miles)
  • Expected: .success([...]) with both games in route

Tests verify ScenarioBPlanner detects impossible combinations early and returns explicit failures. If tests fail:

  1. ScenarioBPlanner may not validate geographic feasibility before routing
  2. GameDAGRouter may not enforce driving constraints for anchor games
  3. Failure reasons may not be specific enough (.constraintsUnsatisfiable vs .drivingExceedsLimit)
  4. Fix ScenarioBPlanner's validation logic and failure reporting

Do NOT weaken test assertions - fix the code to match expected behavior.

All tests pass: ```bash xcodebuild -project SportsTime.xcodeproj -scheme SportsTime \ -destination 'platform=iOS Simulator,name=iPhone 17,OS=26.2' \ -only-testing:SportsTimeTests/ScenarioBPlannerTests test ```

Specific tests to verify:

  • Filler conflict tests: 4 new tests (between anchors, same-day, backtracking, multiple options)
  • Impossible combination tests: 5 new tests (distance, reverse order, triangle, driving limit, feasible sanity)

<success_criteria>

  • 9 new tests added to ScenarioBPlannerTests.swift
  • All tests follow TDD pattern (RED → GREEN → REFACTOR)
  • Each feature produces 2-3 commits (test, feat, optional refactor)
  • No test assertions weakened
  • All existing tests continue to pass
  • Tests use existing helper patterns (makeStadium, makeGame, makeRequest) </success_criteria>
After completion, create `.planning/phases/09-trip-planner-modes-tdd/09-02-SUMMARY.md`:

Phase 09 Plan 02: Scenario B Filler Conflict TDD Summary

[Substantive one-liner - what shipped, not "phase complete"]

Performance

  • Duration: [actual time]
  • Started: [timestamp]
  • Completed: [timestamp]

Accomplishments

Feature 1: Filler Game Timing Conflict Prevention

  • RED: [What tests were written, expected failures]
  • GREEN: [What code changes made tests pass, or "tests passed on first run"]
  • REFACTOR: [Cleanup done, or "no refactor needed"]

Feature 2: Impossible Geographic Combination Detection

  • RED: [What tests were written, expected failures]
  • GREEN: [What code changes made tests pass, or "tests passed on first run"]
  • REFACTOR: [Cleanup done, or "no refactor needed"]

Task Commits

List of commits produced (2-3 per feature):

  1. test(09-02): add filler game timing conflict tests
  2. feat(09-02): improve filler game filtering in ScenarioBPlanner (if needed)
  3. test(09-02): add impossible geographic combination tests
  4. feat(09-02): add early validation to ScenarioBPlanner (if needed)

Files Created/Modified

  • SportsTimeTests/ScenarioBPlannerTests.swift - Added 9 tests
  • SportsTime/Planning/Engine/ScenarioBPlanner.swift - [describe changes, or "no changes - tests passed"]

Decisions Made

[Key decisions and rationale, or "None - tests validated existing behavior"]

Deviations from Plan

Auto-fixed Issues

[Any blocking issues fixed during execution, or "None"]

Deferred Enhancements

[Any issues logged to ISSUES.md, or "None"]

Issues Encountered

[Problems and resolutions, or "None"]

Next Phase Readiness

  • Scenario B filler conflict prevention and impossible combinations validated
  • Ready for Plan 09-03: Scenario C Corridor Efficiency TDD
  • No blockers