Commit Graph

9 Commits

Author SHA1 Message Date
Trey t
787a0f795e fix: 12 planning engine bugs + App Store preview export at 886x1920
Planning engine fixes (from adversarial code review):
- Bug #1: sortByLeisure tie-breaking uses totalDrivingHours
- Bug #2: allDates/calculateRestDays guard-let-break prevents infinite loop
- Bug #3: same-day trip no longer rejected (>= in dateRange guard)
- Bug #4: ScenarioD rationale shows game count not stop count
- Bug #5: ScenarioD departureDate advanced to next day after last game
- Bug #6: ScenarioC date range boundary uses <= instead of <
- Bug #7: DrivingConstraints clamps maxHoursPerDriverPerDay via max(1.0,...)
- Bug #8: effectiveTripDuration uses inclusive day counting (+1)
- Bug #9: TripWizardViewModel validates endDate >= startDate
- Bug #10: allDates() uses min/max instead of first/last for robustness
- Bug #12: arrivalBeforeGameStart accounts for game end time at departure
- Bug #15: ScenarioBPlanner replaces force unwraps with safe unwrapping

Tests: 16 regression test suites + updated existing test expectations
Marketing: Remotion canvas set to 886x1920 for App Store preview spec

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-15 17:08:50 -06:00
Trey t
9736773475 feat: improve planning engine travel handling, itinerary reordering, and scenario planners
Add TravelInfo initializers and city normalization helpers to fix repeat
city-pair disambiguation. Improve drag-and-drop reordering with segment
index tracking and source-row-aware zone calculation. Enhance all five
scenario planners with better next-day departure handling and travel
segment placement. Add comprehensive tests across all planners.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-13 08:55:23 -06:00
Trey t
dbb0099776 chore: remove scraper, add docs, add marketing-videos gitignore
- Remove Scripts/ directory (scraper no longer needed)
- Add themed background documentation to CLAUDE.md
- Add .gitignore for marketing-videos to prevent node_modules tracking

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-26 18:13:12 -06:00
Trey t
d97dec44b2 fix(planning): gameFirst mode now uses full date range and shows correct month
Two bugs fixed in "By Games" trip planning mode:

1. Calendar navigation: DateRangePicker now navigates to the selected
   game's month when startDate changes externally, instead of staying
   on the current month.

2. Date range calculation: Fixed race condition where date range was
   calculated before games were loaded. Now updateDateRangeForSelectedGames()
   is called after loadSummaryGames() completes.

3. Bonus games: planTrip() now uses the UI-selected 7-day date range
   instead of overriding it with just the anchor game dates. This allows
   ScenarioBPlanner to find additional games within the trip window.

Added regression tests to verify gameFirst mode includes bonus games.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-21 16:37:19 -06:00
Trey t
8162b4a029 refactor(tests): TDD rewrite of all unit tests with spec documentation
Complete rewrite of unit test suite using TDD methodology:

Planning Engine Tests:
- GameDAGRouterTests: Beam search, anchor games, transitions
- ItineraryBuilderTests: Stop connection, validators, EV enrichment
- RouteFiltersTests: Region, time window, scoring filters
- ScenarioA/B/C/D PlannerTests: All planning scenarios
- TravelEstimatorTests: Distance, duration, travel days
- TripPlanningEngineTests: Orchestration, caching, preferences

Domain Model Tests:
- AchievementDefinitionsTests, AnySportTests, DivisionTests
- GameTests, ProgressTests, RegionTests, StadiumTests
- TeamTests, TravelSegmentTests, TripTests, TripPollTests
- TripPreferencesTests, TripStopTests, SportTests

Service Tests:
- FreeScoreAPITests, RouteDescriptionGeneratorTests
- SuggestedTripsGeneratorTests

Export Tests:
- ShareableContentTests (card types, themes, dimensions)

Bug fixes discovered through TDD:
- ShareCardDimensions: mapSnapshotSize exceeded available width (960x480)
- ScenarioBPlanner: Added anchor game validation filter

All tests include:
- Specification tests (expected behavior)
- Invariant tests (properties that must always hold)
- Edge case tests (boundary conditions)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-16 14:07:41 -06:00
Trey t
1703ca5b0f refactor: change domain model IDs from UUID to String canonical IDs
This refactor fixes the achievement system by using stable canonical string
IDs (e.g., "stadium_mlb_fenway_park") instead of random UUIDs. This ensures
stadium mappings for achievements are consistent across app launches and
CloudKit sync operations.

Changes:
- Stadium, Team, Game: id property changed from UUID to String
- Trip, TripStop, TripPreferences: updated to use String IDs for games/stadiums
- CKModels: removed UUID parsing, use canonical IDs directly
- AchievementEngine: now matches against canonical stadium IDs
- All test files updated to use String IDs instead of UUID()

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-12 09:24:33 -06:00
Trey t
81095a8170 fix: resolve 4 UI/planning bugs from issue tracker
- Lock all maps to North America (no pan/zoom) in ProgressMapView and TripDetailView
- Sort saved trips by most cities (stops count)
- Filter cross-country trips to top 2 by stops on home screen
- Use LocationSearchSheet for Follow Team home location (consistent with must-stop)
- Initialize DateRangePicker to show selected dates on appear

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-11 18:46:40 -06:00
Trey t
f7faec01b1 feat: add Follow Team Mode (Scenario D) for road trip planning
Adds a new planning mode that lets users follow a team's schedule
(home + away games) and builds multi-city routes accordingly.

Key changes:
- New ScenarioDPlanner with team filtering and route generation
- Team picker UI with sport grouping and search
- Fix TravelEstimator 5-day limit (was 2-day) for cross-country routes
- Fix DateInterval end boundary to include games on last day
- Comprehensive test suite covering edge cases:
  - Multi-city routes with adequate/insufficient time
  - Optimal game selection per city for feasibility
  - 5-day driving segment limits
  - Multiple driver scenarios

Enables trips like Houston → Chicago → Anaheim following the Astros.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-11 12:42:43 -06:00
Trey t
1bd248c255 test(planning): complete test suite with Phase 11 edge cases
Implement comprehensive test infrastructure and all 124 tests across 11 phases:

- Phase 0: Test infrastructure (fixtures, mocks, helpers)
- Phases 1-10: Core planning engine tests (previously implemented)
- Phase 11: Edge case omnibus (11 new tests)
  - Data edge cases: nil stadiums, malformed dates, invalid coordinates
  - Boundary conditions: driving limits, radius boundaries
  - Time zone cases: cross-timezone games, DST transitions

Reorganize test structure under Planning/ directory with proper organization.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-11 01:14:40 -06:00