Commit Graph

4 Commits

Author SHA1 Message Date
Trey t
1703ca5b0f refactor: change domain model IDs from UUID to String canonical IDs
This refactor fixes the achievement system by using stable canonical string
IDs (e.g., "stadium_mlb_fenway_park") instead of random UUIDs. This ensures
stadium mappings for achievements are consistent across app launches and
CloudKit sync operations.

Changes:
- Stadium, Team, Game: id property changed from UUID to String
- Trip, TripStop, TripPreferences: updated to use String IDs for games/stadiums
- CKModels: removed UUID parsing, use canonical IDs directly
- AchievementEngine: now matches against canonical stadium IDs
- All test files updated to use String IDs instead of UUID()

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-12 09:24:33 -06:00
Trey t
81095a8170 fix: resolve 4 UI/planning bugs from issue tracker
- Lock all maps to North America (no pan/zoom) in ProgressMapView and TripDetailView
- Sort saved trips by most cities (stops count)
- Filter cross-country trips to top 2 by stops on home screen
- Use LocationSearchSheet for Follow Team home location (consistent with must-stop)
- Initialize DateRangePicker to show selected dates on appear

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-11 18:46:40 -06:00
Trey t
f7faec01b1 feat: add Follow Team Mode (Scenario D) for road trip planning
Adds a new planning mode that lets users follow a team's schedule
(home + away games) and builds multi-city routes accordingly.

Key changes:
- New ScenarioDPlanner with team filtering and route generation
- Team picker UI with sport grouping and search
- Fix TravelEstimator 5-day limit (was 2-day) for cross-country routes
- Fix DateInterval end boundary to include games on last day
- Comprehensive test suite covering edge cases:
  - Multi-city routes with adequate/insufficient time
  - Optimal game selection per city for feasibility
  - 5-day driving segment limits
  - Multiple driver scenarios

Enables trips like Houston → Chicago → Anaheim following the Astros.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-11 12:42:43 -06:00
Trey t
1bd248c255 test(planning): complete test suite with Phase 11 edge cases
Implement comprehensive test infrastructure and all 124 tests across 11 phases:

- Phase 0: Test infrastructure (fixtures, mocks, helpers)
- Phases 1-10: Core planning engine tests (previously implemented)
- Phase 11: Edge case omnibus (11 new tests)
  - Data edge cases: nil stadiums, malformed dates, invalid coordinates
  - Boundary conditions: driving limits, radius boundaries
  - Time zone cases: cross-timezone games, DST transitions

Reorganize test structure under Planning/ directory with proper organization.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-11 01:14:40 -06:00