Files
honeyDueKMP/iosApp
Trey T 091248f30f Fix per-test isolation flakiness: relaunch instead of UI logout; 4 workers
The first full 8-worker run surfaced 52 failures, 28 of them "Failed to log out"
(UITestHelpers:86) — forcing a profile-navigation logout between every test (each
test = new account) is fragile, and 8 parallel simulator clones thrashed the
machine (the remaining failures were UI timeouts under that load).

- AuthenticatedUITestCase: relaunchBetweenTests = true. A fresh app launch with
  --reset-state lands on the login screen, so each test logs in as its own account
  with NO UI logout between tests. Removed the ensureLoggedOut call.
- run_ui_tests.sh: default workers 8 -> 4 (reliable on a Mac mini; each test now
  relaunches + creates an account, so the bottleneck is CPU/simulator).

Verified: ContractorUITests (was ~15 logout failures) now passes at 4 workers,
0 leaked accounts.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-05 17:42:38 -05:00
..
wip
2026-02-18 10:54:25 -06:00