Phase 3 Plan 1: Visual Flattening Summary
Pure ItineraryFlattener utility replacing bucket-based flattening with sortOrder-based deterministic display ordering
Performance
- Duration: 3 min
- Started: 2026-01-18T21:52:57Z
- Completed: 2026-01-18T21:55:13Z
- Tasks: 2
- Files modified: 2
Accomplishments
- Created
ItineraryFlattenerenum with pureflatten()function - Replaced bucket-based flattening (beforeGames/afterGames) with sortOrder sort
- Deterministic display order: same semantic state always produces same row order
- Updated architecture documentation to reflect sortOrder-based approach
Task Commits
Each task was committed atomically:
- Task 1: Create ItineraryFlattener utility -
fdfc912(feat) - Task 2: Refactor reloadData() to use ItineraryFlattener -
dd1fd82(refactor)
Files Created/Modified
SportsTime/Core/Models/Domain/ItineraryFlattener.swift- Pure flatten function with sortOrder-based orderingSportsTime/Features/Trip/Views/ItineraryTableViewController.swift- Refactored reloadData() to use flattener
Decisions Made
- Day headers not positioned: Day headers are always first in each day, not part of the sortOrder-based ordering. This is a structural anchor.
- Flattener is a pure function: No instance state, no side effects. Enables easy unit testing and guarantees determinism.
- gamesByDay dictionary: Built in reloadData() to pass to flattener rather than having flattener access day.games directly.
Deviations from Plan
None - plan executed exactly as written.
Issues Encountered
None.
User Setup Required
None - no external service configuration required.
Next Phase Readiness
- ItineraryFlattener ready for unit tests in plan 03-02
- reloadData() now uses pure flattening, enabling snapshot testing
- Phase 4 drag-drop can rely on deterministic flatten output
Phase: 03-visual-flattening Completed: 2026-01-18