Tasks completed: 3/3
- Verified requirements coverage (CONS-01 through CONS-04)
- Migrated 13 tests to Swift Testing (expanded to 22)
- Deleted old XCTest file
SUMMARY: .planning/phases/02-constraint-validation/02-01-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Tasks completed: 3/3
- Add edge case tests (10 new tests)
- Create API documentation for Phase 4
- Run full test suite (22 constraint tests pass)
SUMMARY: .planning/phases/02-constraint-validation/02-02-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Document public API for drag-drop integration:
- isValidPosition() for position validation
- validDayRange() for precomputing valid days
- barrierGames() for visual highlighting
- Integration patterns for ItineraryTableViewController
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Phase 2: Constraint Validation
- 2 plans in 1 wave (parallel)
- Both plans autonomous (no checkpoints)
Plan 02-01: Migrate 13 XCTest tests to Swift Testing
Plan 02-02: Add edge case tests and document constraint API
Note: ItineraryConstraints is already fully implemented.
This phase verifies and standardizes tests.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Phase 2: Constraint Validation
- Discovered ItineraryConstraints already implemented
- 17 XCTest tests cover all CONS-* requirements
- Integration with ItineraryTableViewController verified
- Main work: migrate tests to Swift Testing
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>