docs(01): complete Semantic Position Model phase
Phase 1 verified: - 8/8 requirements satisfied (DATA-01 through DATA-05, PERS-01 through PERS-03) - 34 tests passing (22 unit + 12 integration) - SortOrderProvider with 6 methods for sortOrder calculation - Trip extension with day derivation methods Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
@@ -15,8 +15,8 @@ Build a drag-and-drop itinerary editor for SportsTime using UITableView bridged
|
||||
**Plans:** 2 plans
|
||||
|
||||
Plans:
|
||||
- [ ] 01-01-PLAN.md - Create SortOrderProvider utility and Trip day derivation methods
|
||||
- [ ] 01-02-PLAN.md - Create tests verifying semantic position persistence
|
||||
- [x] 01-01-PLAN.md - Create SortOrderProvider utility and Trip day derivation methods
|
||||
- [x] 01-02-PLAN.md - Create tests verifying semantic position persistence
|
||||
|
||||
**Requirements:**
|
||||
- DATA-01: All movable items have semantic position `(day: Int, sortOrder: Double)`
|
||||
@@ -103,12 +103,12 @@ Plans:
|
||||
|
||||
| Phase | Status | Requirements | Completed |
|
||||
|-------|--------|--------------|-----------|
|
||||
| 1 - Semantic Position Model | Planned | 8 | 0 |
|
||||
| 1 - Semantic Position Model | ✓ Complete | 8 | 8 |
|
||||
| 2 - Constraint Validation | Not Started | 4 | 0 |
|
||||
| 3 - Visual Flattening | Not Started | 3 | 0 |
|
||||
| 4 - Drag Interaction | Not Started | 8 | 0 |
|
||||
|
||||
**Total:** 0/23 requirements completed
|
||||
**Total:** 8/23 requirements completed
|
||||
|
||||
---
|
||||
*Roadmap created: 2026-01-18*
|
||||
|
||||
Reference in New Issue
Block a user