Files
Sportstime/.planning/STATE.md
Trey t baa3dfef0b docs(06-01): complete validation reports plan
Add SUMMARY.md documenting validation capabilities:
- --validate flag with local/CloudKit/sync validation
- --list-orphans flag with completeness metrics and health score
- Menu options 16-17 for interactive mode

Update STATE.md: Phase 6 complete (14/14 plans, 100%)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-10 10:35:49 -06:00

3.6 KiB

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-01-09)

Core value: Every game must correctly link to its teams and stadium — a game at the wrong venue or with broken team links ruins trip planning. Current focus: Phase 7 — Testing & Documentation (next)

Current Position

Phase: 6 of 7 (Validation Reports) — COMPLETE Plan: 1 of 1 in current phase Status: Complete Last activity: 2026-01-10 — Completed Phase 6 (Validation Reports)

Progress: ██████████ 100% (14 of 14 plans complete)

Performance Metrics

Velocity:

  • Total plans completed: 14
  • Average duration: 6.4 min
  • Total execution time: 90 min

By Phase:

Phase Plans Total Avg/Plan
1. Script Architecture 3/3 23 min 7.7 min
2. Stadium Foundation 2/2 14 min 7 min
2.1. Additional Sports Stadiums 3/3 17 min 5.7 min
3. Alias Systems 2/2 6 min 3 min
4. Canonical Linking 1/1 4 min 4 min
5. CloudKit CRUD 2/2 14 min 7 min
6. Validation Reports 1/1 12 min 12 min

Recent Trend:

  • Last 5 plans: 04-01 (4 min), 05-01 (6 min), 05-02 (8 min), 06-01 (12 min)
  • Trend: Consistent

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • 01-01: Each sport module has its own get_{sport}_team_abbrev() function for independence
  • 01-01: Import fallback pattern (try/except) for running from Scripts/ or project root
  • 01-02: NBA/NHL use season string format (2024-25) for cross-calendar-year seasons
  • 01-02: Each module has hardcoded stadium list with coordinates as reliable fallback
  • 01-03: NFL uses cross-calendar-year season format (2025-26) like NBA/NHL
  • 01-03: Non-core sports (WNBA, MLS, NWSL, CBB) remain inline with TODO markers
  • 02-01: Used original opening years (not renovation years) for year_opened field
  • 02-01: Stadium dataclass already supported year_opened - no changes needed to core.py
  • 02-02: MLS stadiums excluded from bundled JSON (incomplete data), deferred to Phase 2.1
  • 02.1-01: Used soccer configuration capacities for shared NFL stadiums (e.g., Mercedes-Benz 42,500 for soccer vs 71,000 for NFL)
  • 02.1-01: Prioritized hardcoded source (priority=1) over gavinr GeoJSON (priority=2) for complete data
  • 02.1-02: Cross-referenced shared arena coordinates from nba.py and nhl.py for WNBA venues
  • 02.1-03: Cross-referenced 10 of 13 NWSL stadiums from mls.py for shared venue coordinates
  • 02.1-03: CBB deferred to future phase (350+ D1 teams requires separate scoped approach)
  • 04-01: Team abbreviation aliases discovered during canonicalization runs are added iteratively to TEAM_ABBREV_ALIASES
  • 05-01: New records use forceReplace; updated records use update with recordChangeTag for conflict detection
  • 05-01: Orphan deletion requires explicit --delete-orphans flag for safety (safe by default)
  • 05-02: Triple lookup fallback: direct recordName -> deterministic UUID -> canonicalId query
  • 06-01: Health score formula: avg_completeness - orphan_penalty (max -30) - unknown_penalty (max -10)
  • 06-01: --list-orphans requires CloudKit connection; --validate works with or without

Roadmap Evolution

  • Phase 2.1 inserted after Phase 2: Add stadium data for MLS, WNBA, NWSL, CBB (INSERTED)

Deferred Issues

None yet.

Blockers/Concerns

None yet.

Session Continuity

Last session: 2026-01-10 Stopped at: Completed Phase 6 (Validation Reports) Resume file: N/A Next action: Plan Phase 7 (Testing & Documentation) - final phase