Phase 9 complete: All three trip planner modes validated with TDD. Summary of 09-03 accomplishments: - Feature 1: Corridor game inclusion (5 tests, 1 fix) - Enhanced findDirectionalStadiums() to exclude beyond-endpoint games - Feature 2: Anti-backtracking validation (7 tests, all passed) - Confirmed existing implementation validates monotonic progress 12 tests added, 3 commits (2 test, 1 feat). State updates: - Progress: 30% → 40% - Phase 9: Complete (3/3 plans) - Next: Phase 10 (Trip Builder Options TDD) Co-Authored-By: Claude Sonnet 4.5 <noreply@anthropic.com>
2.1 KiB
2.1 KiB
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-01-10)
Core value: Every game must correctly link to its teams and stadium — a game at the wrong venue or with broken team links ruins trip planning. Current focus: v1.1 TDD & Correctness — Phase 9
Current Position
Phase: 9 of 12 (Trip Planner Modes TDD) Plan: 3 of 3 in current phase Status: Phase complete Last activity: 2026-01-10 — Completed 09-03: Scenario C corridor efficiency TDD
Progress: ████░░░░░░ 40%
Shipped Milestones
| Milestone | Phases | Plans | Shipped |
|---|---|---|---|
| v1.0 Data Pipeline | 1-7 (+2.1) | 15 | 2026-01-10 |
Accumulated Context
Decisions
| Phase | Decision | Rationale |
|---|---|---|
| 08-02 | Dynamic beam width scaling (800+→50, 2K+→30, 5K+→25) | Prevents exponential blowup with large datasets while preserving diversity; achieves 10-17x speedup |
| 08-02 | Early termination (<5K at 2x, ≥5K at 3x beam width) | Stops expansion when sufficient diverse routes found; ensures consistent performance |
| 09-01 | Dynamic time buffers (same-day: 2hr/0.5hr, multi-day: 3hr/1hr) | Enables realistic doubleheaders while preserving multi-day behavior; people leave during/after first game for same-day transitions |
See also: PROJECT.md Key Decisions table for architectural decisions.
Deferred Issues
- CBB support (350+ D1 teams requires separate scoped phase)
- Test suite flakiness: 5 tests fail in full suite but pass individually (Swift Testing parallel execution + simulator state pollution, pre-existing issue)
Blockers/Concerns
None.
Roadmap Evolution
- Milestone v1.1 TDD & Correctness created: Test-driven validation of trip planning engine, 5 phases (Phase 8-12)
- Phase 9.1 inserted after Phase 9: Fix flaky test when ran in parallel (URGENT) - 5 tests fail in parallel but pass individually due to Swift Testing state pollution
Session Continuity
Last session: 2026-01-10 Stopped at: Phase 9 complete (trip planner modes TDD) Resume file: None Next action: /gsd:execute-plan .planning/phases/10-trip-builder-options-tdd/10-01-PLAN.md