docs(04-01): complete canonical linking phase
Create 04-01-SUMMARY.md documenting: - 5760 games canonicalized with 100% resolution rate - 3 team aliases added (WSH, NY, ATX) - All validation checks passed Update STATE.md: - Phase 4 complete (11/19 plans done, 58%) - Add 04-01 decision on iterative alias discovery Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
@@ -5,23 +5,23 @@
|
||||
See: .planning/PROJECT.md (updated 2026-01-09)
|
||||
|
||||
**Core value:** Every game must correctly link to its teams and stadium — a game at the wrong venue or with broken team links ruins trip planning.
|
||||
**Current focus:** Phase 3 — Alias Systems
|
||||
**Current focus:** Phase 4 — Canonical Linking
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 3 of 7 (Alias Systems)
|
||||
Plan: 2 of 2 in current phase
|
||||
Status: Phase complete
|
||||
Last activity: 2026-01-10 — Completed 03-02-PLAN.md (MLS/WNBA/NWSL canonicalization)
|
||||
Phase: 4 of 7 (Canonical Linking) - COMPLETE
|
||||
Plan: 1 of 1 in current phase - COMPLETE
|
||||
Status: Phase 4 complete, ready for Phase 5
|
||||
Last activity: 2026-01-10 — Completed 04-01 (Canonical Linking)
|
||||
|
||||
Progress: █████░░░░░ 53% (10 of 19 plans complete)
|
||||
Progress: █████░░░░░ 58% (11 of 19 plans complete)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 8
|
||||
- Average duration: 6.8 min
|
||||
- Total execution time: 54 min
|
||||
- Total plans completed: 11
|
||||
- Average duration: 5.8 min
|
||||
- Total execution time: 64 min
|
||||
|
||||
**By Phase:**
|
||||
|
||||
@@ -30,10 +30,12 @@ Progress: █████░░░░░ 53% (10 of 19 plans complete)
|
||||
| 1. Script Architecture | 3/3 | 23 min | 7.7 min |
|
||||
| 2. Stadium Foundation | 2/2 | 14 min | 7 min |
|
||||
| 2.1. Additional Sports Stadiums | 3/3 | 17 min | 5.7 min |
|
||||
| 3. Alias Systems | 2/2 | 6 min | 3 min |
|
||||
| 4. Canonical Linking | 1/1 | 4 min | 4 min |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: 02.1-02 (5 min), 02.1-03 (6 min), 03-01 (4 min), 03-02 (5 min)
|
||||
- Trend: Consistent
|
||||
- Last 5 plans: 02.1-03 (6 min), 03-01 (4 min), 03-02 (2 min), 04-01 (4 min)
|
||||
- Trend: Consistent, trending faster
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -56,6 +58,7 @@ Recent decisions affecting current work:
|
||||
- **02.1-02**: Cross-referenced shared arena coordinates from nba.py and nhl.py for WNBA venues
|
||||
- **02.1-03**: Cross-referenced 10 of 13 NWSL stadiums from mls.py for shared venue coordinates
|
||||
- **02.1-03**: CBB deferred to future phase (350+ D1 teams requires separate scoped approach)
|
||||
- **04-01**: Team abbreviation aliases discovered during canonicalization runs are added iteratively to TEAM_ABBREV_ALIASES
|
||||
|
||||
### Roadmap Evolution
|
||||
|
||||
@@ -72,6 +75,6 @@ None yet.
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-01-10
|
||||
Stopped at: Completed Phase 3 (Alias Systems)
|
||||
Resume file: None
|
||||
Next action: Plan Phase 4 (Canonical Linking)
|
||||
Stopped at: Completed Phase 4 (Canonical Linking)
|
||||
Resume file: N/A - Phase 4 complete
|
||||
Next action: Create Phase 5 plan (CloudKit CRUD)
|
||||
|
||||